top of page
All Posts
Kirkland Lake Discoveries Expands Mirado Gold System with 18.99 g/t Au over 6.7 m and 0.50 g/t Au over 91.0 m
North Zone extended by 85 m; initial MZ drilling intersects broad hydrothermal alteration 500 m west of Mirado; regional drilling permit secured across KL South
1 hour ago8 min read
Kirkland Lake Discoveries Extends Mirado System: 120 m South Step-Out Hits 79.63 g/t Au over 2.1 m; 100 m West Step-Out Intersects 0.98 g/t Au over 62.3 m
KLDC report additional assay results from holes from its ongoing 2026 diamond drilling program at the Mirado Project, located approximately 20 km southeast of Kirkland Lake, Ontario.
Jun 2310 min read
Kirkland Lake Discoveries Intersects 2.46 g/t Au Over 14.7 m in New Fault Zone; 180 m Step-Out Expands Mirado South Mineralization
These latest drill results continue to demonstrate the continuity and scale of the Mirado hydrothermal system.
May 2510 min read
KLDC Hits 50.3 m of Continuous Mineralization with 39.35 g/t Au over 16.4 m, including 1,670 g/t Au over 0.38 m in 40 m Step-Out at Mirado; Six Additional Holes Pending
As we progress into new areas at Mirado, we are seeing the exact geological signatures we had hoped for, broad, continuous mineralization punctuated by high-grade intercepts. KLM26-004 clearly demonstrates the potential of this system. With six additional holes pending, we are eager to see how these results continue to define the scale of this project.
May 48 min read
bottom of page
